Brockman Syncline: Non Process Infrastructure
-
Project Outline
Our Client: Kerman Contracting
Client: Rio Tinto
Project Managers: Worley
Value: TBC
Project Stage: Early Contractor Involvement / Design -
Mon Architects Scope
Modular Architecture and Architectural components that support the installation of the modular build. Including but not liminted to:
- Main Administration Building
- Crib Rooms
- Wellness Areas
-Change rooms / Locker rooms
- Workshop Administration Building
- LME Tyre Change Adminisration Building
- Ablution Blocks, Ice Rooms, Change Rooms
- Emergency Management Hub (Medical and Fire)
- DI Hut -
How do we help?
Mon architects have been involved in the project from early design through to completing 85% Design Development drawings. Supporting our client (Kerman Contracting), their client (Rio Tinto), the project manager (Worley).
From concept design up to 85% Design development, we assist by participating in client workshops and supporting stakeholder engagement, including project managers and operational teams, to confirm that the design reflects functional and operational requirements.
We developed and maintained the architectural Revit model, coordinate with consultants, and assist with clash detection.
-
-
-
Consultants on the Team
DBM Vircon: BIM, Model Management, Design Management
Peritas: Structural Engineer
Pitch Black Group: Civil Engineers
CNFiTech: Electrical
Taycon: Building Surveyor
WA HVAC: Mechanical Engineering
Siphonic Solutions: Siphonic Design