Brockman Syncline: Non Process Infrastructure

  • Project Outline

    Our Client: Kerman Contracting
    Client: Rio Tinto
    Project Managers: Worley
    Value: TBC
    Project Stage: Early Contractor Involvement / Design

  • Mon Architects Scope

    Modular Architecture and Architectural components that support the installation of the modular build. Including but not liminted to:
    - Main Administration Building
    - Crib Rooms
    - Wellness Areas
    -Change rooms / Locker rooms
    - Workshop Administration Building
    - LME Tyre Change Adminisration Building
    - Ablution Blocks, Ice Rooms, Change Rooms
    - Emergency Management Hub (Medical and Fire)
    - DI Hut

  • How do we help?

    Mon architects have been involved in the project from early design through to completing 85% Design Development drawings. Supporting our client (Kerman Contracting), their client (Rio Tinto), the project manager (Worley).

    From concept design up to 85% Design development, we assist by participating in client workshops and supporting stakeholder engagement, including project managers and operational teams, to confirm that the design reflects functional and operational requirements.

    We developed and maintained the architectural Revit model, coordinate with consultants, and assist with clash detection.

  • Consultants on the Team

    DBM Vircon: BIM, Model Management, Design Management
    Peritas: Structural Engineer
    Pitch Black Group: Civil Engineers
    CNFiTech: Electrical
    Taycon: Building Surveyor
    WA HVAC: Mechanical Engineering
    Siphonic Solutions: Siphonic Design